Event Calendar

Watershed Management

Green Street Project

Green Street Project 

The Green Street Project (Project 7) is one of 7 areas under construction within the Package 3 Design-Build for Gravity Sewer System Rehabilitation, Replacement, and Construction. Package 3 was commissioned to repair and replace damaged infrastructure. Project benefits include improved sewer capacity, long term infrastructure improvements and most importantly, the reduction of Sanitary Sewer System Overflows.

Briarcliff Corridor Water Infrastructure Replacement Project

Briarcliff Corridor Water Infrastructure Replacement Project

DeKalb County Department of Watershed Management will replace all water services, valves, hydrants and outdated meter boxes. This work will include upsizing water transmission pipe varying in sizes from 8-inch to 12-inch ductile iron pipe for optimized water service and long term infrastructure improvements. Work will occur in the following 4 Areas.

Subscribe to Watershed Management