Event Calendar

Pennybrook Lift Station Improvement Project

Web page headers.png

     Project Details

 

     Project Description

 

     Project Status

Name: Pennybrook Lift Station Improvement and Force Main Installation Project

Type: Wastewater

Location: 2240 Catrina Court Stone Mountain, GA 30083

Cost: $1,141,460

Project Timeframe: Final Completion February 2019

 

A lift station is designed to move wastewater through a sewer pipe, commonly known as a force main, from a lower elevation to a higher elevation. The project includes the installation of new sewer pumps, wet well, generator, and control panels to enhance capacity as well as improve service and reliability of the existing lift station, installation of 400 feet of new ductile-iron force main sewer pipe to easily convey future flows and reduce noise, odors, and sanitary sewer overflows in the Stone Mountain area.

 

 

 

 

         

 

Follow DWM on Social: Facebook | Twitter | Youtube

Contact Us:

1-800-986-1108

projectinfo@dekalbcountyga.gov

www.dekalbwatershed.com

Sign up for the DWM Email List!